500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation

Basic Information
Place of Origin: China (Mainland)
Brand Name: forster
Certification: CE/TUV/ISO9001/From-E
Model Number: XJA-W-63/1*10
Minimum Order Quantity: 1 Unit/Units
Price: Negotiable
Packaging Details: Wood Box
Delivery Time: 120days
Supply Ability: 50 Unit/Units per Month
Type: Hydro Power Generator Designer Head: 125-270 M
Traffic: 0.744-1.2 M/s The Output: 515.3-2284.3 Kw
Design Speed: 750-1000 R/min Driving Mode: Straight League,Between The United
Pipe Diameter: 400-600 Mm Keyword: Hydro Generator Turgo Turbine
Port: Shanghai/shenzhen
High Light:

turgo hydro generator

,

hydroelectric power plant generator

High head low price simple operation 500kw hydro Turgo turbine generator for hydro power Plant

 

 

Our main products included:

 

1. Kaplan turbine generators series.

 

2. Turgo turbine generators series.

 

3. Tubular turbine generators series.

 

4. Francis turbine generators series.

 

5. Pelton turbine generators series.

 

Product features:

 

The impact type Turgo turbine is composed of a manual speed regulating valve (some are needles), a nozzle, a runner, a casing, a bearing and a shaft seal.
The nozzle direction of the turbulent turbine is at an angle (typically 22.5°) to the plane of rotation of the runner, and the jet impinges on the impeller obliquely.

The nozzle is mounted behind the pressure water pipe manual speed control valve. The nozzle is a conical tube. As the cross-sectional area of ​​the conical tube becomes smaller, the water flow gradually accelerates, forming a high-speed jet at the nozzle outlet, impacting the rotor.
In order to adjust the flow rate and control the output of the unit, the unit operates well and has high efficiency. Some micro-units are regulated with gate valves.

The runner is the heart of the turbine. The larger-capacity slanting runner has complex blades and a streamlined section (such as the airfoil of the aircraft). The manufacturing process requires high requirements. For the miniature slanting wheel, in order to simplify the production process and reduce the cost, a hemispherical blade is formed. The blades of the runner are stamped out on a punch with a steel plate with a thickness of 2 mm and trimmed by trimming. An impeller generally consists of 18 to 22 blades. The blade is assembled and welded to form a runner, and the whole manufacturing process is simple.

 

1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.

 

2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

 

Product features:

 

XJA-W Turgo tubine generator unit Generator Unit output (kw) Gevernor or Regulating work Valve (mm)
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity
XJA-W-70/1*16.5 125 1.013 982.6 750 SFW1000-8/1180 1000 914 CJWT- 1 BWT-6000 DN600 P=25kg/cm2
130 1.034 1053.6 SFW1000-8/1180 1000 980
140 1.73 1199.6 SFW1250-8/1180 1250 1116
150 1.11 1344.3 SFW1250-8/1180 1250 1250
160 1.147 1492.5 SFW1600-8/1430 1600 1388
170 1.182 1642 SFW1600-8/1430 1600 1527
180 1.216 1786.5 SFW1600-8/1430 1600 1661
190 1.250. 1931.5 SFW2000-8/1430 2000 1796
200 1.282 2077.6 SFW2000-8/1430 2000 1932
210 1.314 2225.1 SFW2000-8/1430 2000 2069
XJA-W-80/1x18 100 1.09 883.2 500 SFW800-12/1730 800 795 CJWT- 1 BWT-6000 600
110 1.141 1015.8 SFW1000-12/1730 1000 914
120 1.19 1151.5 SF1000-12/1730 1000 1036
130 1.24 1299.9 600 SFW1250-10/1430 1250 1169
140 1.287 1460 SFW1250-10/1430 1250 1314
150 1.333 1620.2 SFW1600-10/1430 1600 1458
160 1.376 1779.7 SFW1600-10/1430 1600 1602
170 1.419 1947.6 SFW1600-10/1430 1600 1752
180 1.46 2106.3 SFW2000-10/1430 2000 1895
190 1.5 2278.6 SFW2000-8/1430 2000 2119
200 1.54 2474.6 750 SFW2500-8/1730 2500 2301
210 1.58 2682.1 SFW2500-8/1730 2500 2494
XJA-W-80/1x20 100 1.338 1093.4 500 SFW1000-12/1730 1000 962 CJWT- I BWT-6000 600
110 1.4 1253.9 SFW1250-12/1730 1250 1103
120 1.465 1421.1 600 SFW1250-12/1730 1250 1250
130 1.525 1610.3 SFW1600-10/1430 1600 1449
140 1.538 1757.4 SFW1600-10/1430 1600 1582
150 1.638 2003 SFW2000-10/1730 2000 1802
160 1.692 2199 SFW2000-10/1730 2000 1979
170 1.744 2399.5 SFW2000-10/1730 2000 2159
180 1.795 2602.3 SFW2500-10/1730 2500 2342
190 1.84 2819.1 750 SFW2500-8/1730 2500 2622

 

Product pictuers:

 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 0500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 1

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 2

 

 

Company Information:
 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 3

Our workshop
 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 4

Advantages
 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 5

Packaging & Shipping
 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 6

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

 

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation 7

 

 

 

Contact Details
George

Phone Number : +8613408630944

WhatsApp : +8613408630944