Electrical Automation Control Francis Turbine Generator For Hydro Power Plant

Basic Information
Place of Origin: Sichuan, China (Mainland)
Brand Name: Forster
Certification: CE/TUV/ISO9001
Model Number: HLJS01/-WJ-60
Minimum Order Quantity: 1 Set/Sets
Price: Negotiable
Packaging Details: wood box
Delivery Time: 180days
Payment Terms: L/C, T/T
Supply Ability: 50 Set/Sets per Month
Governor: High Hydraulic Microcomputer Governor Control System: Automation Control System
Valv: Gate Valve Voltage: 380v,400v,10KV,35KV
Design Head: 48-152m Design Flow: 1.05-6.72m3/s
Pipe Diameter: DN500-1250mm Generator: Brushless Excitation
Processing Method: CNC Machining / Constant Temperature Annealing
High Light:

small francis turbine

,

francis water turbine

Electrical automation control Francis Turbine Generator For Hydro Power Plant

 

Our main products included:

 

1. Kaplan turbine generators series.

 

2. Turgo turbine generators series.

 

3. Tubular turbine generators series.

 

4. Francis turbine generators series.

 

5. Pelton turbine generators series.

 

Product features : 

 

1. Applicable to medium and low lift and large flow application scenarios;

 

2. Pressure inlet, pressure outlet; pipeline water, pipeline water.

 

3. The turbine is separated from the generator to facilitate maintenance and replacement of consumables, and to reduce damage to the equipment caused by jitter.

 

4. The Francis turbine has 3 independent bearings and 2 generators for a more reliable construction.

 

5. The turbine bearing adopts independent lubrication system, which has longer bearing life and more convenient maintenance.

 

6. Brushless excitation generator, no need to replace the carbon brush, for high-voltage large-scale unit, optional thyristor excitation can be used, and maintenance is more convenient.

 

Product parameters:

 

HL-WJ-Francis tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Power(kw) Efficiency(%)
HLJS01/
-WJ-60
48 1.05 750 440 89 SFW400-8 DST-3000 Or YT3000 Z945T-10Dg500
56 1.1 537 89.5 SFW500- 8
65 1.25 710 89.5 SFW630-6
HLJS01/
-WJ-60A
75 1.37 1000 897 89 SFW800-6 DST-3000 Or YT3000 Z945H-16Dg600
87 1.41 1071 SFW1000-6
102 1.52 1354 SFW1250-6
HLJS01/
-WJ-71
62 1.4 750 690 89 SFW630-8 YT-6000 Z945T-10Dg500
70 1.54 885 89.5 SFW800-8
81 1.66 1000 1095 89.5 SFW1000-8 YWT-10000 Z945H-16Dg600
96 1.81 1374 89 SFW1250-8
112 1.95 1750 89 SFW1600-6
127 2.1 2174 89.5 SFW2000-6
HLJS01/
-WJ-84
88 2.42 750 2181 89 SFW2000-8 YWT10000 Z945H-16Dg800
102 2.68 2761 SFW2500-8
118 2.92 1000 3491 SFW3200-8 TWT18000 Z945H-25Dg800
140 3.09 4370 SFW4000-6
162 3.38 5313 SFW5000-6
HLJS01/
-WJ-100
92 3.63 600 2915 91 SFW2500-10 YWT-10000 PDF16(25)-WYDg1000
108 3.84 3642 89.5 SFW3200-10
128 4.17 750 4530 89.8 SF4000-8 YWT-18000
142 4.51 5474 90.8 SF5000-8
166 5.6 6810 90 SF6300-8
HLJS01/
-WJ-120
89 5.17 500 4342 90 SF4000-12 YWT-18000 PDF16(25)-WYDg1250
115 5.62 5296 SF5000-12
132 6.21 600 6658 SF6300-10 YWT-30000
152 6.72 8477 SF8000-10

 

Product pictuers: 

 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 0Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 1

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 2Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 3

 

Installation design drawings:

 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 4

 

Company Information:
 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 5 

 
Our Workshop:
 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 6 

 
Advantages:
 

 Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 7

 

Packaging & Shipping:
 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 8

FAQ

 

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website:www.fstgenerator.com

 

 

Electrical Automation Control Francis Turbine Generator For Hydro Power Plant 9

 

 

 

Contact Details
Kevin

Phone Number : +8618010544031

WhatsApp : +8613408630944