Quick Closing Turbine Control Valve In Hydropower Stations CE/TUV Approval

Basic Information
Place of Origin: Sichuan, China (Mainland)
Brand Name: Forster
Certification: CE/TUV/ISO9001/From-E
Model Number: D941H-1.0 DN800
Minimum Order Quantity: 1 Set/Sets
Price: Negotiable
Packaging Details: wood box
Delivery Time: 60days
Payment Terms: L/C, T/T
Supply Ability: 50 Set/Sets per Month
Type: Butterfly Valve Certificate: CE/TUV/ISO9001/From-E
Pipe Diameter: DN800mm Function1: Electric Bypass And PLC Interface
Function2: To Avoid The Accident Function3: Blocking Water Flow
Function4: Work With The Governor Keyword: Vavel
Port: Shanghai,shenzhen
High Light:

turbine governor valve

,

water pressure regulator valve

The Quick Closing At 0.5s Butterfly Valve Used To Control Water Intake In Hydropower Stations

 

Main Products:

(1) Kaplan turbine generators series.

(2) Turgo turbine generators series, e.g. vertical type and horizontal type.

(3) Tubular turbine generators series, e.g. Bulb type and shaft extension type.

(4) Francis turbine generators series.

(5) Pelton turbine generators series and double turbine generators series and so on.

 

Product features:

 

1. It can be used on "hydraulic control slow closing check butterfly valve" or "hydraulic control slow closing check eccentric half ball valve" at the outlet of various pump stations, with uniform speed opening.

First fast and then slow two-stage closing mode, valve opening time, valve closing Angle and valve closing time are adjustable. And can effectively eliminate water hammer or pipe rise

Pressure, prevent water pump from flying and reversing, protect the safety of water pump unit and pipeline system.

 

2. It can be used on the "water turbine inlet water control butterfly valve" or "water turbine inlet water control ball valve" of the water turbine inlet, equipped with a connection with the main valve

Dynamic control "bypass line" control system.

 

3. Can be used in all kinds of industrial pipeline hydraulic control butterfly valve (ball valve), to meet various needs of users.

 

4. The electrical control system generally adopts PLC intelligent control, which greatly simplifies the electrical circuit and has strong fault self-diagnosis function. Can be local,

Remote control, subject to central control room and linkage control with water pump (or turbine), high degree of automation, safe and reliable, is to achieve "fewer people on duty,

Ideal equipment for dereliction of duty;

 

5. The liquid control device has the following functions:

- local control

- remote control

- automatic oil pressure control of hydraulic system

- interlocking control of circulating pump motor and valve

- interlocking control of hydraulic turbine units and valves

 

6. The liquid control system adopts accumulator for energy storage. When the power is cut off on site and there is no power supply or fault, the accumulator can release energy according to the use requirements

Emergency shutdown or reservation function to provide adequate safety guarantee for unit operation;

 

7. The electrical control box can be installed as a whole with the hydraulic station, or it can be arranged separately, depending on the field conditions;

 

8. "special trip feedback device" is made with "waterproof, dustproof and impact proof" technology, which is a rare product detail of domestic and foreign manufacturers at present

Design. In the products of other manufacturers at home and abroad, the travel switch is mostly exposed, and often has the travel switch malfunction or damage phenomenon, which is serious

Affect the normal operation of valve.

 

Product pictures:

 

Quick Closing Turbine Control Valve In Hydropower Stations CE/TUV Approval 0Quick Closing Turbine Control Valve In Hydropower Stations CE/TUV Approval 1

Installation picture:

Quick Closing Turbine Control Valve In Hydropower Stations CE/TUV Approval 2

Company Information:
 

Quick Closing Turbine Control Valve In Hydropower Stations CE/TUV Approval 3

Our workshop

Work shop

Advantages

advantages

Packaging & Shipping

packing shipping

FAQ

 

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

 

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

hydro turbine

Contact Details
Kevin

Phone Number : +8618010544031

WhatsApp : +8613408630944