Place of Origin: | Sichuan, China (Mainland) |
---|---|
Brand Name: | FORSTER |
Certification: | CE/TUV/ISO9001/From-E |
Model Number: | ZDJP502-LH-180 |
Minimum Order Quantity: | 1 Set/Sets |
Price: | Negotiable |
Packaging Details: | wooden box |
Delivery Time: | 120days |
Payment Terms: | L/C, T/T |
Supply Ability: | 20 Set/Sets per Month |
Certificate: | CE,TUV,ISO9001 | Rated Power: | 2318kw |
---|---|---|---|
Water Head: | 12m | Application: | River,stream,dam |
Flow Rate: | 21.69m3/s | Design Speed: | 350r/min |
Efficiency: | 0.88 | Runner Material: | Stainless Steel |
Keyword: | Water Turbine | Port: | Shanghai/shenzhen |
High Light: | kaplan hydro turbine generator,kaplan water turbine |
Large Power Hydro Turbine Generator Automatic Control System High Efficiency 2mw For Water Power Plant
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
The axial flow turbine refers to the counterflow type turbine runner whose water flow enters the runner from the axial direction and flows out from the axial direction along the blade, and converts the water flow energy into mechanical energy according to whether the runner blade can rotate and is divided into the axial flow propeller type. And axial flow fixed paddle type. Axial flow turbines typically use a head range of 3-80m. The axial flow turbine runner is composed of a runner body, a blade and a water discharge cone. The number of blades is less than that of the mixed flow type, and the blade axis is perpendicular to the axis of the turbine. It is suitable for hydropower stations with medium and low heads and large flow. Under the same head, the specific speed is higher than that of the Francis turbine. The application head is approximately 3 to 80 m. The flow of water changes from radial flow to axial flow between the vane and the runner, while in the runner region, the flow remains axially flowing.
1. Suitable for the development of low water head (2-30m) larger flow of water resources;
2. Appliceable to large and small head change load changes of power plant;
3. For the low head,head and power changed greatly power station,can stably under various working conditions;
4. This machine is a vertical shaft device,has the advantages of simple structure,convenient repair,equipment,low price,easy to realize the direct drive etc.
Product features:
1. suitable for high head,small flow and flow changes in large runoff hydropower station;
2. With the power plant investment is small,compact units structure characteristics;
3. Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency;
4. Suitable for high head amall flow station in mountain area;
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area.
Product parameters:
Turbine parameters | Generator parameters | Other detailed parameters | ||||
Model | Design head(m) | Under the design head | Design speed(r/min) |
power (kw) |
Efficiency (%) |
For other detailed parameters and requirements, please consult the business personnel |
traffic (m/s) |
||||||
ZD500-LH-180 Turbine performance data |
14.4 | 10.56 | 250 | 1356 | 90.9 | |
15.1 | 12.59 | 250 | 1696 | 90.9 | ||
18.2 | 13.12 | 300 | 2129 | 90.9 | ||
22.5 | 13.31 | 300 | 2643 | 90.9 | ||
24 | 15.74 | 375 | 3368 | 90.9 | ||
14.3 | 13.59 | 250 | 1720 | 90.2 | ||
15.2 | 15.86 | 300 | 2133 | 90.2 | ||
18.1 | 16.52 | 300 | 2646 | 90.2 | ||
23.1 | 16.55 | 300 | 3383 | 90.2 | ||
12.3 | 16 | 250 | 1726 | 89.4 | ||
15.5 | 15.69 | 250 | 2133 | 89.4 | ||
16.3 | 18.75 | 300 | 2646 | 89.4 | ||
20.6 | 18.74 | 300 | 3383 | 89.4 | ||
12.3 | 16 | 214.3 | 1726 | 89.4 | ||
13.2 | 18.47 | 250 | 2138 | 89.4 | ||
16.3 | 18.75 | 250 | 2681 | 88.4 | ||
18 | 21.6 | 300 | 3372 | 88.4 |
Product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.